Course Content
C7. CHAPTER 7 – MANUFACTURING AND PROCESSING SOLID PROPELLANTS
You don't currently have access to this content
155 Topics
124 Quizzes
C7.1. GENERAL and C7.1.1.
You don't currently have access to this content
Scope of Chapter 7
You don't currently have access to this content
C7.1.2.
You don't currently have access to this content
Basis of Classification
You don't currently have access to this content
C7.1.3.
You don't currently have access to this content
Variability of Hazards
You don't currently have access to this content
C7.2. PROPERTIES OF PROPELLANTS
You don't currently have access to this content
Sources of Variation
You don't currently have access to this content
C7.2.1. Single Base Propellants
You don't currently have access to this content
Composition of Single-Base Propellants
You don't currently have access to this content
Stabilizer Types and Tests for Single-Base Propellants (supplementing C7.2.1)
You don't currently have access to this content
C7.2.2. Double Base Propellants
You don't currently have access to this content
Main Ingredients
You don't currently have access to this content
C7.2.3. Triple Base Propellants
You don't currently have access to this content
Definition of Triple-Base
You don't currently have access to this content
Nitroguanidine (NQ) Chemical Properties Overview
You don't currently have access to this content
C7.2.4. Composite Propellants
You don't currently have access to this content
Primary Components
You don't currently have access to this content
Explain HTPB binder advantages
You don't currently have access to this content
C7.3. IN-PROCESS HAZARDS and C7.3.1
You don't currently have access to this content
Timing of Classification
You don't currently have access to this content
Remote Operations Rules (from DoD Manual 4145.26-M (2008), primarily C7.4 and Table C7.T1)
You don't currently have access to this content
C7.3.2.
You don't currently have access to this content
Core Required Tests
You don't currently have access to this content
TB 700-2 Test Procedures Overview
You don't currently have access to this content
C7.3.3.
You don't currently have access to this content
Cured Propellant Detonation
You don't currently have access to this content
C7.3.3.1.
You don't currently have access to this content
Impact on Siting
You don't currently have access to this content
C7.3.3.2.
You don't currently have access to this content
Condition for Split Classification
You don't currently have access to this content
C7.3.3.3.
You don't currently have access to this content
Possible Reason for Higher Cured Hazard
You don't currently have access to this content
C7.3.4
You don't currently have access to this content
DoD Contract Reclassification
You don't currently have access to this content
C7.3.4.1.
You don't currently have access to this content
When Classification Changes
You don't currently have access to this content
Compatibility Group L (CG L) Overview
You don't currently have access to this content
C7.3.4.2.
You don't currently have access to this content
Condition for HD 1.3 CG C
You don't currently have access to this content
Intraline Distance (ILD) Details in DoD Explosives Safety Standards
You don't currently have access to this content
C7.3.4.3.
You don't currently have access to this content
Trigger for HD 1.1 CG D
You don't currently have access to this content
C7.3.4.4.
You don't currently have access to this content
Why Fine AP is HD 1.1
You don't currently have access to this content
Scenario Analysis under C7.3.4 (Ammonium Perchlorate Classification Rules)
You don't currently have access to this content
C7.4. SEPARATION OF OPERATIONS AND BUILDINGS and C7.4.1
You don't currently have access to this content
Core Requirement
You don't currently have access to this content
Table C7.T1 – Control and Personnel Protection Requirements for Certain Propellant Processing Operations
You don't currently have access to this content
C7.4.2.
You don't currently have access to this content
Dedicated Facility Justification
You don't currently have access to this content
C7.4.3.
You don't currently have access to this content
Shield Requirement
You don't currently have access to this content
Examples of Operational Shields in Explosives Facilities
You don't currently have access to this content
C7.4.4.
You don't currently have access to this content
Why Dual Siting
You don't currently have access to this content
C7.5. EQUIPMENT AND FACILITIES and C7.5.1.
You don't currently have access to this content
Grounding Scope When ESD is a Hazard
You don't currently have access to this content
C7.5.1.1.
You don't currently have access to this content
Default Requirement
You don't currently have access to this content
C7.5.1.2.
You don't currently have access to this content
Purpose of Make-Before-Break
You don't currently have access to this content
C7.5.2.
You don't currently have access to this content
Primary Cause of Mixer Fires
You don't currently have access to this content
C7.5.2.1.
You don't currently have access to this content
C7.5.2.1.1.
You don't currently have access to this content
C7.5.2.1.2.
You don't currently have access to this content
C7.5.2.1.3.
You don't currently have access to this content
C7.5.2.1.4.
You don't currently have access to this content
C7.5.2.1.5.
You don't currently have access to this content
C7.5.2.1.6.
You don't currently have access to this content
C7.5.2.1.7.
You don't currently have access to this content
C7.5.2.1.8.
You don't currently have access to this content
C7.5.2.2.
You don't currently have access to this content
Three Purposes of Covers
You don't currently have access to this content
C7.5.2.3
You don't currently have access to this content
Maintenance Requirement
You don't currently have access to this content
C7.5.3.
You don't currently have access to this content
Compatibility Requirement
You don't currently have access to this content
C7.5.4.
You don't currently have access to this content
Operations Requiring Analysis
You don't currently have access to this content
C7.5.5.
You don't currently have access to this content
Key C13.4 Requirement
You don't currently have access to this content
C7.5.6.
You don't currently have access to this content
Preferred Radiator Types
You don't currently have access to this content
C7.5.7.
You don't currently have access to this content
Motor Location Requirement
You don't currently have access to this content
C7.5.8.
You don't currently have access to this content
Equipment Rating
You don't currently have access to this content
Explosion-Proof Motor Classifications (NEC / NFPA 70 & DoD Context)
You don't currently have access to this content
Intrinsically Safe (IS) Equipment Overview
You don't currently have access to this content
C7.5.9.
You don't currently have access to this content
Purpose of Stabilization
You don't currently have access to this content
C7.5.10.
You don't currently have access to this content
Examples of Controls
You don't currently have access to this content
C7.5.11.
You don't currently have access to this content
Core Requirement
You don't currently have access to this content
C7.5.12.
You don't currently have access to this content
Pre-Operation Check
You don't currently have access to this content
C7.5.13.
You don't currently have access to this content
Purpose of Bonding/Grounding
You don't currently have access to this content
C7.5.14.
You don't currently have access to this content
Filter Placement
You don't currently have access to this content
C7.5.15.
You don't currently have access to this content
If Submerged Design Used
You don't currently have access to this content
C7.5.16.
You don't currently have access to this content
Purpose of Inspection
You don't currently have access to this content
C7.5.17.
You don't currently have access to this content
Deluge System Requirement
You don't currently have access to this content
C7.5.18.
You don't currently have access to this content
Frequency Determination
You don't currently have access to this content
C7.5.19.
You don't currently have access to this content
Focus for Remote Operations
You don't currently have access to this content
C7.5.20.
You don't currently have access to this content
Common Control Method
You don't currently have access to this content
C7.5.21.
You don't currently have access to this content
Expectation for Tools
You don't currently have access to this content
C7.5.21.1.
You don't currently have access to this content
Purpose of Release Coatings
You don't currently have access to this content
C7.5.21.2.
You don't currently have access to this content
ESD Requirement
You don't currently have access to this content
C7.5.21.3.
You don't currently have access to this content
Scope of C7.5.21.3
You don't currently have access to this content
Explosion-Proofing Standards Overview
You don't currently have access to this content
C7.6. IN-PROCESS QUANTITIES AND STORAGE and C7.6.1
You don't currently have access to this content
In-Process Quantity Rule
You don't currently have access to this content
C7.6.2.
You don't currently have access to this content
Allowance for Storage
You don't currently have access to this content
Dedicated Storage Magazines in DoD Manual 4145.26-M (2008)
You don't currently have access to this content
C7.6.3.
You don't currently have access to this content
Storage Allowance
You don't currently have access to this content
C7.6.4.
You don't currently have access to this content
Temporary Staging Definition
You don't currently have access to this content
C7.6.5.
You don't currently have access to this content
Core Requirement
You don't currently have access to this content
C7.7. INGREDIENTS PROCESSING and C7.7.1. Weighing, Measuring, and Handling Raw Materials
You don't currently have access to this content
C7.7.1.1.
You don't currently have access to this content
Default ESD Requirement
You don't currently have access to this content
C7.7.1.2.
You don't currently have access to this content
Isolation Requirement
You don't currently have access to this content
C7.7.1.3.
You don't currently have access to this content
Prohibition on Sharing
You don't currently have access to this content
C7.7.1.4.
You don't currently have access to this content
Change of Use Prohibition
You don't currently have access to this content
C7.7.2. Oxidizer Processing
You don't currently have access to this content
Mandatory Remote Operations
You don't currently have access to this content
C7.7.2.1.
You don't currently have access to this content
Prohibited Metal Example
You don't currently have access to this content
C7.7.2.2.
You don't currently have access to this content
Purpose of Closed Systems
You don't currently have access to this content
C7.7.2.3.
You don't currently have access to this content
Prohibited Material
You don't currently have access to this content
C7.7.2.4.
You don't currently have access to this content
Electrical Continuity Requirement
You don't currently have access to this content
C7.8.2.5.
You don't currently have access to this content
Primary Hazard in Fluidization
You don't currently have access to this content
C7.7.3. Oxidizer Drying and C7.7.3.1.
You don't currently have access to this content
Temperature Requirement
You don't currently have access to this content
C7.7.3.2.
You don't currently have access to this content
Trigger for Redundancy
You don't currently have access to this content
C7.7.3.3.
You don't currently have access to this content
Prohibition Scope
You don't currently have access to this content
C7.7.3.4.
You don't currently have access to this content
Dust Collection Requirement
You don't currently have access to this content
C7.7.3.5.
You don't currently have access to this content
Re-use After Flammables
You don't currently have access to this content
C7.7.4. Screening Oxidizers and C7.7.4.1.
You don't currently have access to this content
Purpose of Cleaning
You don't currently have access to this content
C7.7.4.2.
You don't currently have access to this content
Purpose of Bonding/Grounding
You don't currently have access to this content
C7.7.4.3.
You don't currently have access to this content
Small-Scale Manual Screening
You don't currently have access to this content
C7.7.5. Grinding Oxidizers and Nitramines and C7.7.5.1.
You don't currently have access to this content
Grinding Prohibition
You don't currently have access to this content
C7.7.5.2
You don't currently have access to this content
Pre-Grinding Requirement
You don't currently have access to this content
C7.7.5.3.
You don't currently have access to this content
Lubricant Requirement
You don't currently have access to this content
C7.7.5.4.
You don't currently have access to this content
Monitoring Features
You don't currently have access to this content
C7.7.5.5.
You don't currently have access to this content
Cleaning Requirement
You don't currently have access to this content
C7.7.5.6.
You don't currently have access to this content
Recommendation for Dust Control
You don't currently have access to this content
C7.7.5.7.
You don't currently have access to this content
Static Generation Source
You don't currently have access to this content
C7.7.6. Preparations of Fuel Compositions and C7.7.6.1.
You don't currently have access to this content
Purpose of Determination
You don't currently have access to this content
C7.7.6.2.
You don't currently have access to this content
Controls for Mixing
You don't currently have access to this content
C7.7.6.3
You don't currently have access to this content
Equipment Grounding
You don't currently have access to this content
C7.7.6.4.
You don't currently have access to this content
Examples of Controls
You don't currently have access to this content
C7.7.6.5.
You don't currently have access to this content
Hazard from Moisture
You don't currently have access to this content
C7.7.6.6.
You don't currently have access to this content
Integration
You don't currently have access to this content
C7.7.7. Transfer Operations and C7.7.7.1.
You don't currently have access to this content
Transfer Requirement
You don't currently have access to this content
C7.7.7.2.
You don't currently have access to this content
C7.8. MIXING and C7.8.1.
You don't currently have access to this content
Core Requirement
You don't currently have access to this content
C7.8.2.
You don't currently have access to this content
Purpose of Screening
You don't currently have access to this content
C7.8.3.
You don't currently have access to this content
Primary Risk Minimized
You don't currently have access to this content
Deflagration-to-Detonation Transition (DDT)
You don't currently have access to this content
C7.8.4.
You don't currently have access to this content
Tool Requirement for Scraping
You don't currently have access to this content
C7.8.5.
You don't currently have access to this content
Egress Requirement
You don't currently have access to this content
Summary of C12.7 – Egress Requirements
You don't currently have access to this content
C7.9. CASTING AND CURING
You don't currently have access to this content
Three Common Casting Methods
You don't currently have access to this content
C7.9.1.
You don't currently have access to this content
Hazard Analysis Scope
You don't currently have access to this content
C7.9.2.
You don't currently have access to this content
PCO Requirement Trigger
You don't currently have access to this content
C7.9.3.
You don't currently have access to this content
Threaded Joints
You don't currently have access to this content
C7.9.4.
You don't currently have access to this content
Method to Eliminate Contact
You don't currently have access to this content
C7.9.5.
You don't currently have access to this content
Hazard Addressed
You don't currently have access to this content
C7.9.6.
You don't currently have access to this content
Safety Factor Requirement
You don't currently have access to this content
ASME Pressure Vessel Standards Overview
You don't currently have access to this content
C7.9.7.
You don't currently have access to this content
Lid Securing Requirement
You don't currently have access to this content
C7.9.8.
You don't currently have access to this content
Relief Valve Location
You don't currently have access to this content
C7.9.9.
You don't currently have access to this content
Blowout Disk Requirement
You don't currently have access to this content
C7.9.10.
You don't currently have access to this content
Pressure Relief Requirement
You don't currently have access to this content
C7.9.11.
You don't currently have access to this content
Operation Requirement
You don't currently have access to this content
C7.9.12.
You don't currently have access to this content
Disconnection Methods
You don't currently have access to this content
C7.10. EXTRUSION PROCESSES and C7.10.1.
You don't currently have access to this content
Cleaning Requirement
You don't currently have access to this content
C7.10.2.
You don't currently have access to this content
Purpose of Alignment Check
You don't currently have access to this content
C7.10.3.
You don't currently have access to this content
Common Interlock Type
You don't currently have access to this content
C7.11. PROPELLANT LOADED AE and C7.11.1.
You don't currently have access to this content
Fixture Requirement
You don't currently have access to this content
C7.11.2.
You don't currently have access to this content
Exceptions
You don't currently have access to this content
C7.11.3.
You don't currently have access to this content
Securing Requirement
You don't currently have access to this content
C7.11.4.
You don't currently have access to this content
Design Requirement
You don't currently have access to this content
C7.11.4.1.
You don't currently have access to this content
Design Objective
You don't currently have access to this content
C7.11.4.2.
You don't currently have access to this content
Heat Minimization Requirement
You don't currently have access to this content
C7.11.4.3.
You don't currently have access to this content
X-ray Recommendation
You don't currently have access to this content
C7.11.5.
You don't currently have access to this content
Waste Storage
You don't currently have access to this content
C7.11.6.
You don't currently have access to this content
Aisles and Exits
You don't currently have access to this content
C7.11.7.
You don't currently have access to this content
Review Basis
You don't currently have access to this content
C7.11.8.
You don't currently have access to this content
Purpose of Shorting
You don't currently have access to this content
C7.11.9.
You don't currently have access to this content
Personnel Grounding Trigger
You don't currently have access to this content
C6.4.7 Personnel Grounding (as referenced in C7.11.9)
You don't currently have access to this content
C7.11.10.
You don't currently have access to this content
Fixture Capability
You don't currently have access to this content
C7.12. DISASSEMBLY and C7.12.1.
You don't currently have access to this content
Design Requirement
You don't currently have access to this content
C7.12.2.
You don't currently have access to this content
Hazard Focus
You don't currently have access to this content
C7.13. LOGISTICAL MOVES
You don't currently have access to this content
End-of-Course Narrative
You don't currently have access to this content
Final Quiz
Chapter 7 – End of Course Quiz (30 Questions)
You don't currently have access to this content
