Comprehensive Training on DoD Manual 4145.26 (2008) – DoD Contractors’ Safety Manual for Ammunition and Explosives (Chapter 5, QD Principles, Criteria, and Siting Requirements)

Written by

in

Welcome to the most comprehensive and practical training available on DoD Manual 4145.26 (2008) – DoD Contractors’ Safety Manual for Ammunition and Explosives.

Welcome to the most comprehensive and practical training available on DoD Manual 4145.26 – DoD Contractors’ Safety Manual for Ammunition and Explosives.

Whether you are a contracting officer, safety professional, program manager, subcontractor, or preparing for a DoD survey (e. g. DCMA, Buying Activity, etc.), this course equips you with the knowledge needed to help you demonstrate compliance with DFARS 252.223-7002/7003, DoD Manual 4145.26 (2008) and implement controls to protect personnel, property, public and mission success.

By completing this course, you will be able to:

  • Explain the chapter and key paragraph of DoDM 4145.26 (2008), including requirements and underlying intent
  • Knowledge to assist in preparation for and respond effectively to DCMA explosives safety surveys
  • Earn an official certificate documenting your mastery — valuable evidence for contracts, audits, and professional development

How to Navigate This Course

Lessons: Each lesson includes plain-language explanations, spirit & intent narratives (for information only) and access to downloadable resources.

Quizzes: Each lesson contains quizzes and a final exam. Passing score: 85% is required to obtain the certificate.

Progress: Complete lessons and quizzes sequentially — your dashboard tracks everything.

Support: Use the course forum or contact me directly for question.

Course Content

C5. CHAPTER 5 – QD PRINCIPLES, CRITERIA, AND SITING REQUIREMENTS
469 Topics
391 Quizzes
C5.1. GENERAL and C5.1.1
Purpose of QD Standards
C5.1.2 Distances required in Reference (c)
Conditions for QD Reduction
C5.1.3. This Chapter sets forth:
Purpose of C5.1.3
C5.2. and C5.2.1 QD PRINCIPLES
Primary Explosion Hazards
C5.2.2.
Basis for QD Determination
C5.2.3 QD PRINCIPLES
QD Determination
C5.2.4. Any building, vehicle, location, or ammunition
PES vs ES
C5.2.5 The QD tables in Reference (c) and the associated formulae
Primary Governing Characteristics
C5.2.6 The minimum distance for protection from hazardous fragments
Fragment Distance vs. Maximum Range
C5.3. DETERMINING NEWQD and C5.3.1. NEWQD Determination Methods.
When NEWQD < NEW
C5.3.1.1. HD 1.1.
NEWQD Formula for HD 1.1
C5.3.1.2. HD 1.2. includes paragraphs C5.3.1.2.1. thru C5.3.1.2.3.
Basic HD 1.2 NEWQD Rule
C5.3.1.2.1. HD 1.2.1.
NEWQD for HD 1.2.1
C5.3.1.2.2. HD 1.2.2.
NEWQD Formula for HD 1.2.2
C5.3.1.2.3. HD 1.2.3.
NEWQD for HD 1.2.3
C5.3.1.3. HD 1.3.
Reason for Including Pyrotechnics
C5.3.1.4. HD 1.4.
Hazard Characteristics of HD 1.4
C5.3.1.5. HD 1.5.
Characteristics of HD 1.5
C5.3.1.6. HD 1.6.
Single Item Consideration
Purpose of C5.3.2
C5.3.2.1 General, includes C5.3.2.1.1
Effect of HD 1.4 on NEWQD
C5.3.2.1 General, includes C5.3.2.1.2
Treatment of Mixture with HD 1.1
C5.3.2.1 General, includes C5.3.2.1.3
Reason for the Rule
C5.3.2.1 General, includes C5.3.2.1.4
Rule for Dissimilar HD 1.6
C5.3.2.2. HD 1.1 with HD 1.2 (HD 1.2.1, HD 1.2.2, and HD 1.2.3).
General Rule for HD 1.1 + HD 1.2
C5.3.2.2.1.
Why Sum the NEWQDs
C5.3.2.2.2.
Which Subdivision Usually Governs
C5.3.2.3.
Treatment of the Mixture
C5.3.2.4.
Treatment of the Mixture
C5.3.2.5.
Which Subdivision Usually Governs
C5.3.2.6.
Treatment of HD 1.2.3
C5.3.2.7.
Governing NEWQD Rule
C5.3.2.8.
Treatment of HD 1.2.3
C5.3.2.9.
Treatment of HD 1.2.3 / HD 1.3
C5.3.2.10.
Treatment of HD 1.6
C5.3.2.11.
Why HD 1.3 Treatment
Practical Implication
Enhancement Module for C5.4.1
Approval Process
C5.4.2. (with C5.4.2.1 and C5.4.2.2)
Purpose of C5.4.2
C5.4.2.1. Separation by Time (Distance).
Preventing Coalescence
C5.4.2.2. Separation by Barriers.
Acceptable Barrier Standards
C5.4.3.
Governing Distance
C5.4.4.
Governing Hazard
C5.4.5.
Standard Measurement Method
C5.4.6.
Purpose of the Rule
C5.4.7.
K-Factor Notation
K-factor
Detailed K-factor selection guide
Formatted K-Factor Guidance Sheet
C5.5. TYPES OF QDs and C5.5.1. – Inhabited Building Distance (IBD)
Definition of IBD
C5.5.2. – Public Traffic Route Distance (IBD)
Definition of PTRD
C5.5.3. – Intraline Distance (ILD)
Definition of ILD
C5.5.4. – Intermagazine Distance (IMD)
Definition of IMD
Comparison: 7-Bar vs. 3-Bar Earth-Covered Magazines (ECMs)
Aboveground Magazines (AGM) vs. Earth-Covered Magazines (ECM)
Barricade Types for Aboveground Magazines (AGMs)
Principal Hazards of HD 1.1
C5.6.1.1.
Possible Damage
C5.6.1.2.
Residual Risks
Overpressure Level
C5.6.2.1.1.
Why This Overpressure Level
C5.6.2.1.2.
Personnel Consequences at 27 psi
C5.6.2.1.3.
Expected Vehicle Damage
C5.6.2.1.4.
Why Propagation is Likely
C5.6.2.1.5.
Expected Aircraft Outcome
C5.6.2.1.6.
Limitation of Barricades
C5.6.2.2
C5.6.2.2.1.
Expected Damage at 12 psi
C5.6.2.2.2.
Personnel Consequences at 12 psi
C5.6.2.2.3.
Additional Risk for Loaded Aircraft
C5.6.2.2.4.
Expected Vehicle Damage at 12 psi
C5.6.2.2.5.
Effect of Improper Barricades
C5.6.2.2.6.
How Barricades Work
C5.6.2.3.
C5.6.2.3.1.
Expected Damage at 8 psi
C5.6.2.3.2.
Practical Siting
C5.6.2.3.3.
Specific Risk at 8 psi
C5.6.2.3.4.
Practical Siting
C5.6.2.3.5.
Damage Mechanisms
C5.6.2.3.6.
Link to Other Rules
C5.6.2.3.7.
Benefit of Barricades
C5.6.2.4.
C5.6.2.4.1.
Key Statement at 3.5 psi
C5.6.2.4.2.
Comparison with Direct Propagation
Fire Propagation Examples
Mitigation Strategies for Fire Propagation
C5.6.2.4.3.
Expected Damage Level
C5.6.2.4.4.
Eardrum Damage Risk at 3.5 psi
C5.6.2.4.5.
Personnel Injury Risk at 3.5 psi
Firebrand Travel Distances in Explosives Safety Contexts
C5.6.2.4.6.
Expected Aircraft Damage at 3.5 psi
C5.6.2.4.7.
Expected Vehicle Damage at 3.5 psi
C5.6.2.4.8.
Purpose of Engineered Construction
C5.6.2.5.
Comparison: PTRD vs. IBD – Rationale and Key Differences
C5.6.2.5.1.
Expected Damage at 2.3 psi
C5.6.2.5.2.
Main Injury Mechanisms
C5.6.2.5.3.
C5.6.2.5.4
Main Exceptions
C5.6.2.5.5.
Expected Aircraft Outcome at PTRD
C5.6.2.5.6.
Benefit of Barricading at PTRD
C5.6.2.6.
C5.6.2.6.1.
Expected Building Damage at 1.7 psi
C5.6.2.6.2.
Primary vs. Secondary Effects
C5.6.2.6.3.
Why This Risk Exists
C5.6.2.6.4.
Expected Outcome for Parked Aircraft
C5.6.2.6.5.
Risk to Personnel in the Open
C5.6.2.6.6
When These Measures Are Most Useful
C5.6.2.7.
C5.6.2.7.1.
Expected Building Damage at IBD
C5.6.2.7.2.
Protection Level at IBD
C5.6.2.7.3.
Risk to Personnel in the Open at IBD
C5.6.2.7.4.
Best Control for Glass Hazard
C5.6.3.
Primary Hazard for HD 1.2
C5.6.4.
Fireball Behavior
C5.6.5.
Fireball / Jet Extent
HD 1.4 Insensitivity Mechanisms
C5.6.6.
HD 1.5 vs. HD 1.1
C5.6.7.
HD 1.6 Effects
C5.7. PERMISSIBLE EXPOSURES and C5.7.1. HD 1.1 Blast Overpressure
Purpose of C5.7
C5.7.1.1.
Overpressure at Barricaded ILD
C5.7.1.1.1.
Meaning of “Successive Steps”
C5.7.1.1.2.
Exception for Integral Breakrooms
C5.7.1.1.3.
Key Restriction
C5.7.1.1.4.
Key Requirement
C5.7.1.1.5.
Scope Restriction
C5.7.1.1.6.
Separation Distance Rule
C5.7.1.1.7. Exceptions: paragraphs C5.7.1.1.7.1 and C5.7.1.1.7.2.
Documentation
C5.7.1.1.7.2.
Separation Distances
C5.7.1.2.
Reason for Longer Distance
C5.7.1.2.1.
Permitted Operation at 3.5 psi
C5.7.1.2.2.
Permitted Buildings
C5.7.1.2.3.
Criticality Note
C5.7.1.2.4.
Key Restriction
C5.7.1.2.5.
Scope
C5.7.1.2.6.
Barricade Requirement
C5.7.1.2.7.
Magazine-Area Restriction
C5.18.4 – Conveyance Loading and Unloading at a Magazine
C5.7.1.2.8.
Single-PES Parking
C5.7.1.2.9.
Key Requirement
C5.7.1.3.
Additional Protections
C5.7.1.4.
Purpose of C5.7.1.4
C5.7.1.4.1.
First Permitted Exposure at PTRD
C5.7.1.4.2.
Why “No Structures”
C5.7.1.4.3.
Important Note
C5.7.1.4.4.
Structures
C5.7.1.5.
Documentation
C5.7.1.5.1.
Practical Application
C5.7.1.5.2
Contractor Responsibilities
C5.7.1.5.3.
Comparison with C5.7.1.4.2
C5.7.1.5.4.
Documentation
C5.7.1.5.5.
Key Criteria
C5.7.1.5.6
Documentation
C5.7.1.5.7.
Documentation
C5.8.1.7.5 – Traffic Density Criteria
C5.7.1.5.8.
Documentation
C5.7.2.
Difference from HD 1.1
C5.7.2.1. ILD.
Barricade Effectiveness
C5.7.2.2. PTRD.
Documentation
C5.7.2.3. IBD.
Documentation
C5.8. HAZARDOUS FRAGMENT DISTANCE (HFD) and C5.8.1.
Importance of Fragments
Primary vs. Secondary Fragments
C5.8.1.1.
Key Characteristics
Hazardous Fragment Distance (HFD) Calculation Methods
C5.8.1.2
Size and Velocity
C5.8.1.3.
Factors Considered
C5.8.1.4.
Protection Level
C5.8.1.5.
Risk Management
C5.8.1.5.1. Minimum HD 1.1 HFDs apply to: C5.8.1.5.1.1
Application of Minimum HFD
Monitoring Procedures for HFD Extensions Beyond Plant Boundaries
Expanded Explanation:
C5.8.1.5.1.2.
Siting Implication
C5.8.1.5.1.3.
Reason for Protection
C5.8.1.5.1.4.
Documentation
C5.8.1.5.1.5.
Application of Minimum HFD
C5.8.1.5.1.6.
Documentation
C5.8.1.5.1.7.
Documentation
C5.8.1.5.1.8.
Reason for Protection
C5.8.1.5.2.
Purpose of C5.8.1.5.2
C5.8.1.5.2.1
“Directly Support” Definition
C5.8.1.5.2.2.
Qualifying Example
C5.8.1.5.2.3.
Scope of Exception
C5.8.1.5.2.4.
Documentation
C5.8.1.5.2.5.
Purpose of C5.8.1.5.2.5
C5.8.1.6.
Facility Storage Requirement
C5.8.1.7.
Trigger for Default HFD
C5.8.1.7.1.
Quantity Threshold
C5.8.1.7.1.1.
Distance Source
C5.8.1.7.1.2.
Practical Implication
C5.8.1.7.1.3.
Front Exposure Rule
C5.8.1.7.1.4.
Approval Authority
C5.8.1.7.1.5.
Trigger Conditions
C5.8.1.7.1.6.
Documentation
C5.8.1.7.1.7.
Applicability of Established HFDs
C5.8.1.7.1.8.
Documentation
C5.8.1.7.2.
Practical Importance
C5.8.1.7.2.1.
Reduction Option
C5.8.1.7.2.2.
Role of C5.9
C5.8.1.7.2.3.
Documentation
C5.8.1.7.2.4.
Documentation
C5.8.1.7.2.5.
Why More Conservative
C5.8.1.7.2.6
Reason for Different Treatment
C5.8.1.7.2.7.
Documentation
Understanding the K40 Formula for HFD (d = 40 W¹/³)
C5.8.1.7.3.
Reduced ECM Distances
C5.8.1.7.3.1.
Distance Source
C5.8.1.7.3.2.
Documentation
C5.8.1.7.3.3.
Documentation
C5.8.1.7.3.4.
Trigger Conditions
C5.8.1.7.4.
Sparse Population
C5.8.1.7.5.
Basis for PTR HFD
C5.8.1.7.5.1.
Consequence of High Density
C5.8.1.7.5.2.
Required HFD
C5.8.1.7.5.3.
Required Protection
C5.8.1.7.5.4.
Purpose of C5.8.1.7.5.4
C5.9. IBD and PTRD with C5.9.1.
Practical Workflow
C5.9.2.
Minimum Earth Cover
C5.9.2.1.
Documentation
C5.9.2.2.
Rear Sector Angle
C5.9.2.3.
Complete Coverage
C5.10. ILD and C5.10.1.
Purpose of ILD
C5.10.2.
Distance Source
C5.11. IMD
Purpose of IMD
C5.11.1.
Purpose of the Figures
C5.11.2
Relationship to IMD
C5.11.2.1.
Maximum Quantity per ECM
C5.11.2.2.
Minimum Side-to-Side Distance
C5.11.3.
Documentation
C5.11.3.1.
Consequence of Inadequate Barricade
C5.11.3.2
Failure of Earth Cover
C5.11.4.
External Exposures
C5.12. HD 1.2 with C5.12.1.
Primary Hazards
C5.12.2.
Criteria to Apply
Explanation of Maximum Credible Event (MCE) Calculation
C5.12.3.
NEWQD vs. NEW
C5.12.3.1.
Hazard Level
C5.12.3.2.
Hazard Level Comparison
Purpose of JHCS
C5.12.4.
Default MCE Formula
C5.12.5.
Practical Implication
C5.12.6.
Primary Reference Table
Expanded set of MCE calculation examples
C5.12.7
Core Principle
IMD Examples for Different Structure Types – HD 1.2
C5.12.8.
Documentation
PTRD Calculation Examples for HD 1.2
Comparison of PTRD Rules Across Hazard Divisions (HDs)
C5.12.9.
Documentation
Comparison of ILD Reductions Across Hazard Divisions (HDs)
C5.12.10.
Why Greater Distance?
C5.12.11.
Scope of Exception
Details of Fragmentation Shielding for HD 1.2.2 (C5.12.11 Exception)
C5.12.12.
Documentation
C5.12.13.
Documentation
C5.12.13.1
MCE Used for Minimum
C5.12.13.2
Governing Distance
C5.12.13.3.
Purpose of C5.12.13.3
C5.12.13.3.1.
Documentation
C5.12.13.3.2.
Trigger Condition
C5.12.14.
Mixing with Other HD 1.2 Subdivisions
C5.12.15.
Notation Meaning
C5.12.15.1.
Documentation
C5.12.15.2.
Documentation
C5.12.15.3.
Example – Minimum ILD
HD 1.3
Governing QD Table
Fire Suppression for HD 1.3
Fire Suppression for HD 1.3 – Deluge System Design Details
C5.14. HD 1.4 and C5.14.1.
Governing Table
C5.14.2.
Governing Distance
C5.14.3.
Meaning of “S”
C5.15. HD 1.6
QD Basis
C5.16.1.
Testing Requirement
C5.16.2.
Documentation
C5.16.3.
Toxicity Consideration
C5.17.1.2.
Documentation
C5.17.2. Concept and C5.17.2.1.
Contractor Responsibilities
Examples of Material Compatibility for Energetic Liquids
Contractor Responsibility
C5.17.2.2.
Governing Principle
C5.17.2.3.
Link to Other Rules
C5.17.3. Determination of Energetic Liquids Quantity and C5.17.3.1.
Piping Rule
C5.17.3.2.
Documentation
C5.17.4. Measurement of Separation Distances and C5.17.4.1.
Measurement Starting Point
C5.17.4.2.
Documentation
C5.17.5. Hazard Classification of Energetic Liquids and C5.17.5.1.
Documentation
C5.17.5.1.1. Class 1: Explosives.
Practical Use
UN Class 1 Divisions – Clear Explanation
C5.17.5.1.2. Class 2: Compressed or Liquefied Gases
Documentation
C5.17.5.1.3. Class 3: Flammable Liquids
Documentation
UN Class 3: Flammable Liquids – Packing Groups Explained
Flash Point
C5.17.5.1.4. Class 4: Flammable Solids and Self-Reactive Materials
Relevance to Energetic Liquids
Desensitized Explosives in UN Class 4
C5.17.5.1.5. Class 5: Oxidizers
Common Examples
C5.17.5.1.6. Class 6: Toxic and Infectious Substances
Downwind Concern
C5.17.5.1.7. Class 8: Corrosive
Documentation
C5.17.5.1.8. Class 9: Miscellaneous
Application to Energetic Liquids
Examples of Class 9 Energetic Liquids
C5.17.5. Hazard Classification of Energetic Liquids and C5.17.5.2
Reason for Two-Part Designation
Two-Part Compatibility Group Designation – Practical Examples
C5.17.5.2.1.
Absence of CG
C5.17.5.2.2.
Purpose of ELCG
C5.17.5.2.2.1. LA:
Hazard Behavior
C5.17.5.2.2.2. LB
Hypergolic Risk
Hypergolic Reactions
DoD Implication
Hypergolic Accident Cases
C5.17.5.2.2.3. LC:
Practical Application
C5.17.5.2.2.4. LD:
Differentiation
Monopropellant Systems
Siting Implication
C5.17.5.2.2.5. LE
ELCG LE Definition
C5.17.5.2.3. Mixing of Energetic Liquids and C5.17.5.2.3.1.
Practical Documentation
C5.17.5.2.3.2.
LE Mixing Prohibition
Real-World LE Incidents
C5.17.5.2.3.3.
Caution Within Exception
C5.17.5.2.4.
Classification Meaning
C5.17.5.2.4.1.
Meaning of “C”
C5.17.5.2.4.2
Meaning of “LE”
C5.17.5.3.
Primary Reference
C5.17.5.4.
Mandatory Requirement
C5.17.5.5.
Purpose of Parenthetical Distance
C5.17.5.6.
Site Plan Requirement
C5.17.5.6.1.
Key Risk Factors
C5.17.5.6.2.
Mitigation
C5.17.5.6.2.1.
If Not Met
Full lesson module on C5.17.5.6.2.1 with objectives
C5.17.5.6.2.2.
Purpose of Double-Wall Jacketing
C5.17.5.6.2.3.
Site Plan Requirement
C5.17.5.6.2.4.
Redundancy Meaning
C5.17.5.7.
Distinction from Run Tanks
C5.17.5.8.
Default Rule
C5.17.5.9.
Governing Hazards
C5.17.5.10.
During Transfer
C5.17.5.11.
Exclusion Relief
C5.17.5.12.
Clear Zone Requirement
C5.17.6.
Why Conventional QD Does Not Apply
C5.17.6.1.
Spill Control
C5.17.6.2.
Site Plan Requirement
C5.17.7. Contaminated Energetic Liquids and C5.17.7.1.
Effect of Contamination
C5.17.7.2.
Mandatory Action
C5.18. FACILITIES SITING CRITERIA and C5.18.1.
Purpose of C5.18
C5.18.1.1.
PES Definition
C5.18.1.2.
Reduced Distance Allowance
C5.18.2.
Contractor Responsibility
C5.18.3.
Practical Implication
C5.18.3.1.
“Basis of Use” Link
C5.18.3.2
Site Plan Requirement
Operating Building Types
C5.18.4.
“At a magazine” Definition
C5.18.5. Areas for Burning AE and C5.18.5.1.
Who Is Protected
K24 Overpressure Details
Example K-Factor Calculations
C5.18.5.2.
1,250 ft Minimum
K40 Calculation Examples for Burning AE (based on C5.18.5.2)
C5.18.5.3.
Core Requirement
ILD Calculation Examples
C5.18.6. Areas Used for Intentional Detonations and C5.18.6.1.
Examples of Controls
C5.18.6.2.
Core Requirement
C5.18.6.3.
Core Requirement
C5.18.6.3.1.
Site Plan Requirement
C5.18.6.3.2.
Why “Larger”
C5.18.6.3.2.1.
Final Distance
K328 Formula – Explanation and Derivation
C5.18.6.3.2.2.
Role in Overall Rule
C5.18.6.3.3.
Baseline Distance
C5.18.6.3.3.1.
Rogue Fragments
C5.18.6.3.3.2.
Why Tables Are Insufficient
C5.18.6.3.4.
Link to Overall Rule
C5.18.6.3.4.1
Site Plan Requirement
C5.18.6.3.4.2.
Site Plan Requirement
C5.18.6.3.4.3.
Site Plan Requirement
C5.18.6.3.4.4
Site Plan Requirement
C5.18.6.3.4.5.
Site Plan Requirement
C5.18.6.3.4.5.1.
Site Plan Requirement
C5.18.6.3.4.5.2.
Site Plan Requirement
Further Definition of “Case-by-Case Basis”
C5.18.6.3.4.5.3.
Site Plan Requirement
C5.18.6.4.
Site Plan Requirement
C5.18.7.
Documentation
C5.18.8. Classification Yard and C5.18.8.1.
Site Plan Requirement
C5.18.8.2.
Comparison with C5.18.8.1
C5.18.8.2.1.
Permitted Activity
C5.18.8.2.2.
Relationship to Common Carrier
C5.18.8.2.3.
Scope of Door Opening
C5.18.8.3.
Core Requirement
Additional Requirement
C5.18.9.1.1.
“As Far as Practical” refer to C5.18.9.1.
C5.18.9.1.2.
QD Status
C5.18.9.1.3.
QD Status
C5.18.9.2.
Core Requirement
C5.18.10. Interchange Yards and C5.18.10.1.
Purpose of the Rule
C5.18.10.1.1.
Permitted Activity
DOT Regulations for AE Transport (Overview for DoD Contractors)
Regulatory Scope
Example Siting Approach for the Shipping/Receiving Dock
C5.18.10.1.2.
Scope of Inspection
C5.18.10.1.3.
Permitted Activity
C5.18.10.2.
Cross-Reference
Separation Requirement
C5.18.11.1.1.
Site Plan
C5.18.11.1.2.
Separation Requirement
C5.18.11.2.
What is a Truck-Group
C5.18.11.3.
QD Type Selection
C5.18.11.4.
Permitted Additional Uses
C5.18.12. Holding Areas for Suspect Railcars or Trucks Containing AE.
Core Requirement
C5.18.13. Storage Tanks for Hazardous Materials and C5.18.13.1.
Dike Requirement
NFPA 30 Dike System Details (Relevant to DoD 4145.26-M C5.18.13.1)
C5.18.13.2.
Decision Process
C5.18.13.2.1.
What Must Be Accepted
C5.18.13.2.2.
Meaning of the Condition
C5.18.13.2.3.
Goal of Containment
C5.18.13.3.
Eligible Tanks
C5.18.13.3.1.
Site Plan
C5.18.13.3.2.
Core Requirement
C5.18.13.4.
Site Plan
C5.18.13.5.
Contained PES Exception
C5.18.13.6.
Additional Obligation
C5.18.14. Storage Tanks for Water.
When Loss Is Unacceptable
Purpose
C5.18.16. Inert Storage.
Two Categories
C5.18.16.1.
Documentation
C5.18.16.2.
Siting Requirement
Barricade Effectiveness
C5.18.17.2. Earth Cover for ECMs and Barricades.
Material Cohesiveness
Geotextiles and Gunite (Shotcrete)
C5.18.17.3. ECM Design Criteria and C5.18.17.3.1.
Site Plan
C5.18.17.3.2.
ECM Categories
Comparison of 7-Bar and 3-Bar Earth-Covered Magazines (ECMs)
C5.18.17.3.2.1.
Required Loads
C5.18.17.3.2.2.
Site Plan
C5.18.17.3.2.3.
Site Plan
C5.18.17.3.2.4 Expected blast loads as applicable:
Purpose
C5.18.17.3.2.4.1.
Purpose
C5.18.17.3.2.4.2
Expected Blast Load Location
C5.18.17.3.2.4.3.
Applicability
C5.18.17.3.2.5.
Site Plan
C5.18.17.4. Barricade Design Criteria and C5.18.17.4.1. Slope.
Site Plan
C5.18.17.4.2. Alternate Barriers
Documentation
Fragment Stopping Physics
C5.18.17.4.3.
Basis for Design
DDESB Technical Paper 16 (TP 16) Fragmentation Analysis
C5.18.17.4.3.1.
Site Plan
C5.18.17.4.3.2.
Effect of Location
Fragment Trajectory Geometry
C5.18.17.4.3.3.
Site Plan
C5.18.17.4.3.4
Site Plan
Conditions
C5.18.17.4.4.1.
Proximity Requirement
C5.18.17.4.4.2.
Height Requirement
C5.18.17.4.4.3.
Length Requirement
End-of-Course Narrative
Final Quiz
Chapter 5 End of Course Quiz (50 Questions)

More posts